Running a new circuit across a ceiling in a Toronto or GTA attic or basement almost always means crossing joists, and where you drill matters as much for the structure as for the wiring. This guide covers the actual placement rules — hole location, nail plates, and when notching instead of drilling is (and is not) acceptable.
Drill a hole through the centre of the joist, at least 50 mm (2 inches) from the top and bottom edges, sized just large enough for the cable to pass through freely without being pinched. If the hole ends up within 32 mm of either edge, install a listed steel nail plate on both sides to protect the cable from future nails or screws. Never notch the top or bottom edge of a joist for cable — that is a structural cut, not an electrical one, and it weakens the framing member.
A joist resists bending load mostly through its top and bottom edges, where the wood fibres carry the most stress. The centre of the joist, along its neutral axis, carries the least stress — which is exactly why a hole drilled through the middle has minimal structural impact, while a notch cut into the top or bottom edge removes material from the highest-stress zone and can meaningfully weaken the member. This is a building code structural principle, not an electrical one, but it directly shapes where electricians are allowed to drill.
If the drilled hole (or the cable itself, on a shallow joist) ends up within 32 mm of either the top or bottom edge, the Ontario Electrical Safety Code requires a steel nail plate covering that location on both faces of the joist. The plate protects the cable from a drywall screw, a flooring nail, or any future fastener driven into that same spot from above or below — without it, the cable inside is one careless nail away from a short.
Nail plates are cheap, self-adhesive or nail-on steel plates sold at any electrical supply house. Installing them proactively on every close-to-edge run is standard professional practice, not just a defect fix.
In GTA basement finishes, the most common structural mistake we catch (sometimes from a previous DIY project) is a run of holes drilled too close to the bottom edge of the joists to keep the cable hidden just above a planned drop ceiling. It looks tidy but eats into the joist’s structural margin at every crossing. Centre the hole in the joist depth even if it means the cable sits a little lower in the ceiling cavity — a drop ceiling or bulkhead hides it either way, and the framing keeps its full strength.
Just large enough for the cable to pass freely, typically 12–19 mm for standard NMD90 — avoid oversizing.
No, not for cable runs. Notching the top or bottom edge removes material from the highest-stress zone of the joist.
No. Follow the specific manufacturer’s guide for hole size and location — engineered members behave differently than solid lumber.
Install a nail plate on both faces of the joist at that location before the finish goes up.
Drilling technique is straightforward, but pairing it correctly with circuit design and code compliance is best confirmed by a licensed contractor.
Running new wiring across ceiling joists in a Toronto or GTA home? Call ezsmart at 416-838-9006 or use our contact page. An ESA-licensed electrician will route it safely and protect the framing.
Electrician Since 2008 Journeyman Electrician Designated Master Electrician at EZSMART Corp