What Happens During an ESA Electrical Inspection?

Electrical Q&A
What Happens During an ESA Electrical Inspection?

An Electrical Safety Authority inspection confirms that completed electrical work meets Ontario’s safety code, and it is a required part of most permitted electrical projects. Here is what actually happens during the process, from the licensed electricians at EZSMART, serving Toronto and the GTA.

Before the Inspection

Your licensed electrical contractor files a permit application with the Electrical Safety Authority before starting the work. Once the work is completed, an inspection is scheduled, either in person or in some cases handled remotely depending on the scope of the project and current ESA procedures.

What the Inspector Checks

  • That the completed work matches what was permitted
  • Proper grounding and bonding
  • Correct wire sizing and connection quality
  • Appropriate breaker ratings for the circuits installed
  • Overall compliance with the Ontario Electrical Safety Code

After the Inspection

If everything meets code, you receive a Certificate of Inspection, which serves as official documentation the work was done properly. This certificate is valuable for insurance purposes and can be requested during a future home sale. If an issue is found, your electrician addresses it and the work is reinspected before final approval.

Frequently Asked Questions

Do I need to be home for the ESA inspection?
This depends on the project and access requirements. Your electrician can confirm what is needed for your specific situation.

How long after the work is completed does inspection happen?
This varies based on ESA scheduling and demand, but your electrician typically arranges it promptly after the work is finished.

What if my project fails inspection?
Your electrician addresses the specific issue identified and the work is reinspected, which is a normal part of the process rather than a major setback.

Have questions about the ESA permit and inspection process for your electrical project? EZSMART handles this fully as part of licensed electrical work across Toronto and the GTA. Call 416-838-9006, and see what our customers say on our Google reviews page.

Amir Azimipour

Electrician Since 2008 Journeyman Electrician Designated Master Electrician at EZSMART Corp

Recent Comments

No comments to show.

Archive

September 2026
MTWTFSS
 123456
78910111213
14151617181920
21222324252627
282930 

Recent Posts

12 Sep, 2026

Is It Safe to Do DIY Electrical Work Without Shutting Off the Main?

Is It Safe to Do DIY Electrical Work Without Shutting Off the Main? Wo

07 Sep, 2026

Can Solar Panels Completely Power a House in Ontario?

Can Solar Panels Completely Power a House in Ontario? Solar panels can

Click to chat with us
Chat with us