loading
EZSMART Corporation, ESA/ECRA #7012690 , North York , Ontario
Mon-Fri 08:00 AM - 05:00 PM
EZSMART Corporation, ESA/ECRA #7012690 , North York , Ontario
Mon-Fri 08:00 AM - 05:00 PM
Post Image
09 Jul, 2026
Posted by Amir Azimipour
0 comment

How Long Does EV Charger Installation Take?

Electrical Q&A
How Long Does EV Charger Installation Take?

The physical installation of a Level 2 EV charger is typically completed in a single day, but the full project timeline from booking to inspection is usually longer once permits and any needed panel work are factored in. Here is a realistic breakdown, from the licensed electricians at EZSMART, serving Toronto and the GTA.

Installation Day

A straightforward EV charger install, with the panel already having capacity and a reasonable distance to the charger location, typically takes hours of active work. This includes running new dedicated wiring from the panel to the charger location, mounting and connecting the charger, and testing operation.

Full Project Timeline

  • Assessment and quote: Often same-week for straightforward projects
  • Permit filing: Through the Electrical Safety Authority before work begins
  • Installation day: Typically a single day for the physical work
  • ESA inspection: Scheduled after installation to confirm code compliance

From first call to fully inspected completion, most projects take one to a few weeks depending on permit and inspection scheduling.

What Extends the Timeline

  • Needing a panel upgrade as part of the project
  • Running wiring through finished walls or long distances
  • Installing at a detached garage requiring a subpanel
  • Utility coordination if service disconnection is needed for panel work
  • Permit and inspection scheduling variability

Work should always be performed by a licensed electrician in accordance with Electrical Safety Authority standards.

Frequently Asked Questions

Can I use my new EV charger right after installation day?
Typically yes, once your electrician completes testing. The ESA inspection is a separate step to formally confirm compliance.

How far in advance should I book installation?
Booking a few weeks ahead is a reasonable guideline for straightforward projects, especially in busy seasons.

Do I need to be home during installation?
Yes, someone should be present for access and questions during the work.

Planning an EV charger installation and want an accurate timeline? EZSMART provides licensed EV charger installation across Toronto and the GTA. Call 416-838-9006, and see what our customers say on our Google reviews page.

Amir Azimipour

Electrician Since 2008 Journeyman Electrician Designated Master Electrician at EZSMART Corp

Recent Comments

No comments to show.

Archive

September 2026
MTWTFSS
 123456
78910111213
14151617181920
21222324252627
282930 

Recent Posts

12 Sep, 2026

Is It Safe to Do DIY Electrical Work Without Shutting Off the Main?

Is It Safe to Do DIY Electrical Work Without Shutting Off the Main? Wo

07 Sep, 2026

Can Solar Panels Completely Power a House in Ontario?

Can Solar Panels Completely Power a House in Ontario? Solar panels can

Click to chat with us
Chat with us