loading
EZSMART Corporation, ESA/ECRA #7012690 , North York , Ontario
Mon-Fri 08:00 AM - 05:00 PM
EZSMART Corporation, ESA/ECRA #7012690 , North York , Ontario
Mon-Fri 08:00 AM - 05:00 PM
Electrical Panel Upgrade in Toronto & the GTA
ALL IN ONE PACKAGE

Electrical Panel Upgrade in Toronto & the GTA

Professional and Certified
Electric Vehicle Charger installation
Professional Service
Smart Home Solution
Experiencing an Emergency?
Call 911. For All Other Urgent Needs, EZSMART is Here.

Electrical Panel Upgrade in Toronto & the GTA

An electrical panel upgrade replaces the panel, main breaker, and often the incoming service that feed every circuit in your home. Most GTA homes built before the 1990s were wired for a very different household: no EV charger, no heat pump, no induction range, no basement apartment. If your panel is a 60-amp or 100-amp service — or still a fuse box — it was sized for a house that no longer exists.

EZSMART Corp is a licensed electrical contractor with a Master Electrician on staff and ECRA/ESA authorization on every permit we file. We handle panel upgrades across Toronto, North York, Scarborough, Etobicoke, Vaughan, Markham, Richmond Hill, and the wider GTA.

Signs Your Panel Needs Upgrading

  • You have a fuse box, not breakers. Fuses still work, but insurers increasingly refuse or surcharge these homes, and capacity is almost always 60A or 100A.
  • Breakers trip when normal loads run together. Repeated tripping is the panel telling you the circuit is at its limit — not a nuisance to reset and ignore.
  • The panel is full. No open slots means no new circuits for an EV charger, hot tub, A/C, or basement suite without tandem breakers that may not be permitted for that panel.
  • You are adding a major load. A Level 2 EV charger alone draws 32–48A continuous. On a 100A service already running A/C and a dryer, a load calculation frequently comes back over capacity.
  • Scorch marks, a burning smell, or a warm panel cover. Stop and call an electrician the same day. These are failure symptoms, not maintenance items.
  • The panel is a known-defective brand. Federal Pacific (FPE) Stab-Lok and Zinsco panels have documented breaker-failure histories and are routinely flagged by home inspectors.
  • You are selling or refinancing. An undersized or obsolete panel shows up in every home inspection and becomes a negotiating lever against you.

100 Amp vs 200 Amp: What Most GTA Homes Need

200 amps is the practical standard for a modern detached home in the GTA. It is not about wanting more power for its own sake — it is about whether an electrical load calculation under the Ontario Electrical Code says your planned loads fit.

A 100A service is often still fine for a smaller home with gas heat, gas range, gas dryer, and no EV. Add a Level 2 charger, electric range, or a second suite and that math usually fails. Upgrading to 200A is the difference between adding circuits freely for the next twenty years and paying for a second upgrade in three.

The honest answer is that nobody should quote you a panel size over the phone. A licensed electrician does the load calculation first, then recommends the service size.

200 amp Panel

How a Panel Upgrade Actually Works in Ontario

A service upgrade is not a same-day swap. It involves three parties — your electrical contractor, the Electrical Safety Authority (ESA), and your local utility — and the sequence matters.

  1. Load calculation and site assessment. We measure your existing service, check the meter base, mast, and grounding, and calculate your actual and planned loads to determine the correct service size.
  2. ESA notification (the permit). Every service upgrade in Ontario legally requires an ESA notification. We file it as the licensed contractor — this is not something a homeowner can pull for a main service upgrade.
  3. Utility coordination. Your service has to be disconnected and reconnected by the utility. Scheduling that disconnect is usually the longest part of the timeline, not the electrical work.
  4. Installation day. The physical work — new panel, main breaker, grounding and bonding, transferring and labelling every circuit — typically takes most of a working day.
  5. ESA inspection and Certificate of Inspection. An ESA inspector reviews the installation. The resulting Certificate of Inspection becomes part of your home’s permanent record and is what protects you at resale and on an insurance claim.

Your Utility Determines Your Timeline

Which utility serves you changes the disconnect scheduling process, and it is the single biggest variable in how long your upgrade takes:

  • Toronto Hydro — serves the entire City of Toronto, including North York, Scarborough, Etobicoke, East York, and York.
  • Alectra Utilities — serves Vaughan, Markham, Richmond Hill, Thornhill, Mississauga, and Brampton.
  • Elexicon Energy — serves Pickering, Ajax, Whitby, and parts of Durham Region.

We deal with all three regularly and file the utility paperwork for you. Overhead services are generally faster and less expensive to upgrade than underground services, where the incoming conductors may also need attention.

What a Panel Upgrade Costs

Panel work at EZ Smart starts from $1,599. Where your job lands above that starting point depends on the condition of your mast and meter base, whether your service is overhead or underground, the panel location and cable run, how many circuits transfer, and whether the grounding needs updating.

Anyone who gives you a firm number without seeing the service is guessing. We provide a written quote after the site assessment, with the ESA permit fee stated in it, and the assessment is free.

Why Homeowners Choose EZ Smart

We are fully licensed and insured, with a Master Electrician on staff and ESA authorization on every job. We file the permit, coordinate the utility disconnect, complete the work to the Ontario Electrical Code, and see the ESA inspection through to the Certificate of Inspection — you are not left chasing paperwork.

Every circuit gets properly labelled before we leave, so the next person who opens that panel — including a future inspector or buyer — can actually read it.

Book Your Free Panel Assessment

If your breakers are tripping, your panel is full, or you are planning an EV charger, addition, or basement suite, the load calculation is the place to start.

Call 416-838-9006, book a free estimate, or contact us.

Related Services

Electrical Panel Upgrade in Toronto & the GTA
Electrical Panel Upgrade in Toronto & the GTA
Breaker
Over 25 Years Experience
Experienced and Reliable Electrical Contractors

We are locally owned and operated which makes our services causal as they are done by friendly and helpful technicians.

We started out in 2002. We are locally owned and operated which makes our services causal as they are done by friendly and helpful technicians. Our mission is to service each client with a highly trained and courteous technician that is dependable and always trustworthy.

Permanent Skilled & Certified Electricians

Skilled & Certified Labor

What We Offer

Electrical Panel Upgrade in Toronto & the GTA

Electrical repairs should always be handled by a professional electrician.

Electrical Panel Upgrade in Toronto & the GTA

Electrical panel maintenance, therefore, should be part of your regular routine.

Aluminum wiring replace

Upgrading wire from Aluminum to Copper guarantee the safety of you and your family

Electrical Panel Upgrade in Toronto & the GTA

An electrical surge can happen for a number of reasons, including lightning strikes.

Electrical Panel Upgrade in Toronto & the GTA

Generators are a great way to protect your home or business from brownouts and power outages.

Electrical Panel Upgrade in Toronto & the GTA

If you need an Emergency service in case of fire , overload or any incident get in touch to serve you

Electrical Panel Upgrade in Toronto & the GTA

Outdoor Lighting can transform your outdoor living space completely.

Electrical Panel Upgrade in Toronto & the GTA

Give us a call to plan your Digital Thermostat Installation today.

Electrical Panel Upgrade in Toronto & the GTA

Commercial Units, Stores,Restaurants, Medical Offices

Our Advantages
Reasons You Should Call Us
Electrician is your single source for a complete range of high-quality electrical services, including design/build, engineering and maintenance.
1
24/7 Emergency Services

24/7 emergency electrician you can trust.

2
Free Estimates

Yes, we offer free estimates for electrical additions or replacements.

3
Low Price Guarantee

We strive to offer the lowest price on the market.

FAQ
FAQ
Common questions about electrical panel upgrades in Toronto and the GTA
1
Do I need a permit to upgrade my electrical panel in Ontario?

Yes. Every service or panel upgrade in Ontario requires an ESA notification, which is the permit. It has to be filed by a licensed electrical contractor — a homeowner cannot pull one for a main service upgrade. We file it for you and see the job through to the Certificate of Inspection.

2
How long does a panel upgrade take?

The physical installation is usually most of a single working day. The overall timeline is driven by scheduling the utility disconnect, which commonly takes a couple of weeks depending on whether you are served by Toronto Hydro, Alectra, or Elexicon. ESA inspection follows shortly after the work is complete.

3
How much does a 200 amp panel upgrade cost in Toronto?

Panel work at EZ Smart starts from $1,599. Where your job lands above that depends on your mast and meter base condition, overhead versus underground service, panel location and cable run, and circuit count. We quote in writing after a free site assessment, with the ESA permit fee stated in the quote.

4
Can I upgrade my electrical panel myself?

No. A main service upgrade involves the utility connection and cannot be done under a homeowner permit in Ontario. Beyond the legal issue, working in a panel with a live incoming service is genuinely dangerous — the main lugs stay energized even with the main breaker off.

5
Will my power be off during the upgrade?

Yes, for most of the working day while the service is disconnected, the new panel is installed, and circuits are transferred. We schedule the disconnect with your utility in advance and let you know the window so you can plan around it.

6
Do I need a 200 amp service for an EV charger?

Not always, but often. A Level 2 charger draws 32-48A continuously. On a 100A service already running central A/C, an electric dryer, and a range, a load calculation frequently comes back over capacity. Load management devices are sometimes an alternative — we run the calculation and tell you honestly which applies.

7
Is it worth upgrading the panel before selling my home?

Often yes. An obsolete fuse box, a Federal Pacific or Zinsco panel, or an undersized 60A service shows up in every home inspection and becomes a price negotiation. A documented upgrade with an ESA Certificate of Inspection removes that objection.

Certificates
We are a Qualified & Certified Electrical Company

We currently employ a team of fully qualified electricians and a number of apprentices. We have been registered with he ESA/ECRA and therefore all our electricians are Licensed and registered. Our aim is to keep our services high and our prices very competitive.

Do you Need Help
With Electrical
Maintenance?

Our electrical repair and service options are proudly offered to clients. Give us a call today to schedule a free service estimate!

Chat with us