loading
EZSMART Corporation, ESA/ECRA #7012690 , North York , Ontario
Mon-Fri 08:00 AM - 05:00 PM
EZSMART Corporation, ESA/ECRA #7012690 , North York , Ontario
Mon-Fri 08:00 AM - 05:00 PM
Post Image
09 Jul, 2026
Posted by Amir Azimipour
0 comment

How Long Does It Take to Rewire a House?

Electrical Q&A
How Long Does It Take to Rewire a House?

Full house rewiring typically takes anywhere from a few days to a couple of weeks, depending heavily on your home’s size and whether it is occupied and finished, or open during a renovation. Here is a realistic breakdown, from the licensed electricians at EZSMART, serving Toronto and the GTA.

Typical Timelines

  • During a renovation with open walls: Often the fastest scenario, since wiring can be run without cutting into finished surfaces, typically a few days for an average-sized home
  • Occupied finished home: Slower, since walls must be opened in sections, wiring run, then patched, often extending to one to two weeks or more depending on size
  • Larger or multi-story homes: Extend the timeline further due to additional wiring runs and complexity

What Affects the Timeline

  • Home size and number of circuits being installed
  • Whether the home is occupied during the work
  • Wall accessibility and whether drywall repair is included in the same timeline
  • Whether the project is phased or done all at once
  • Permit and inspection scheduling through the Electrical Safety Authority

Living in Your Home During Rewiring

It is often possible to remain in your home during rewiring, though expect some disruption, including temporary power interruptions to specific areas, dust from wall access points, and limited access to certain rooms while work is underway. Many electricians can phase the project to minimize how many areas are affected at once.

Frequently Asked Questions

Can rewiring be done faster if I am willing to pay more?
Additional crew members can sometimes speed up larger projects, though this depends on the scope and your electrician’s scheduling. It is worth discussing directly if timeline is a priority.

Will I have power throughout the rewiring process?
Power to specific circuits being actively worked on is typically interrupted temporarily, though your electrician will coordinate this to minimize disruption.

Does rewiring take longer in winter?
Not typically, since the work itself is primarily indoors, though scheduling around holidays or high demand periods can affect start dates.

Planning a rewiring project and want an accurate timeline? EZSMART provides licensed rewiring services across Toronto and the GTA. Call 416-838-9006, and see what our customers say on our Google reviews page.

Amir Azimipour

Electrician Since 2008 Journeyman Electrician Designated Master Electrician at EZSMART Corp

Recent Comments

No comments to show.

Archive

September 2026
MTWTFSS
 123456
78910111213
14151617181920
21222324252627
282930 

Recent Posts

14 Sep, 2026

How to Install an Attic Exhaust Fan

An attic exhaust fan moves hot, humid air out of the attic space and r

14 Sep, 2026

EV Charger Installation Cost in Ontario

EV Charger Installation Cost in Ontario Installing a home EV charger i

Click to chat with us
Chat with us