Running electrical wire through a brick exterior wall requires drilling through both the brick exterior and the interior framing. The approach depends on whether the wall is a solid brick construction (common in older Ontario homes) or a brick veneer over a wood frame. For brick veneer, you drill through the brick, cross the cavity, and then through the wood framing — the brick is the outer layer and the cavity or insulation layer is behind it. For solid brick construction, you are drilling through multiple wythes of masonry, which is a much harder and slower task requiring a hammer drill with masonry bits.
Penetrations through the building envelope must be sealed to meet the Ontario Building Code’s air barrier requirements. Electrical penetrations through firewalls or fire-rated assemblies require fire-rated caulk or intumescent sealant. Any new circuit run through an exterior wall requires an ESA permit. EZSMART runs exterior circuits and conduit through brick and masonry walls across Ontario for EV chargers, outdoor outlets, generators, and landscape lighting.
Electrician Since 2008 Journeyman Electrician Designated Master Electrician at EZSMART Corp