loading
EZSMART Corporation, ESA/ECRA #7012690 , North York , Ontario
Mon-Fri 08:00 AM - 05:00 PM
EZSMART Corporation, ESA/ECRA #7012690 , North York , Ontario
Mon-Fri 08:00 AM - 05:00 PM
Shopping Cart
  • No products in the cart.
  • Shopping Cart
  • No products in the cart.
  • Post Image
    10 Jul, 2026
    Posted by EZSMART Corp
    0 comment

    Do I Need a New Panel for a Home Renovation?

    Electrical Q&A
    Do I Need a New Panel for a Home Renovation?

    Not every renovation requires a new panel, but many do, and the answer depends on the scope of your project and the condition of your existing panel. Here is how to think about it, from the licensed electricians at EZSMART, serving Toronto and the GTA.

    When a Panel Upgrade Is Likely Needed

    • Your renovation adds significant new load, like a kitchen with multiple new dedicated circuits, a home addition, or a basement rental suite
    • Your existing panel is smaller (60 or 100 amp) and already at or near capacity
    • Your panel is old, has known problem components, or is a problem brand like Federal Pacific
    • Your panel has no available breaker slots for the new circuits
    • You are also planning to add an EV charger during the renovation

    When You May Not Need One

    • Your renovation is smaller in scope and adds modest load
    • Your existing 200 amp panel has room to spare in capacity and breaker slots
    • A load calculation confirms the new load fits within your panel\’s existing headroom
    • Your existing panel is a reputable brand in good condition

    The Load Calculation

    A licensed electrician performs a load calculation to determine definitively whether your panel supports the renovation. This is more reliable than guessing based on panel size alone. If an upgrade is needed, panels from manufacturers like Eaton or Square D are standard replacements.

    Timing Matters

    If a panel upgrade is needed, doing it as part of the renovation is more efficient than waiting until after the project is done. It coordinates with the overall project timeline and avoids duplicated work. Panel upgrades typically take a day and require utility service disconnection, which your electrician coordinates.

    The Permit and Inspection Process

    Panel upgrades require an ESA permit and inspection through the Electrical Safety Authority. Your licensed electrical contractor handles this.

    Frequently Asked Questions

    How do I know if my panel has enough slots for new circuits?
    A licensed electrician can assess this quickly during a project quote.

    Is it worth upgrading to a 200 amp panel proactively?
    For older homes with 100 amp panels, and especially those adding EVs or major additions, often yes.

    Can I do part of a renovation before deciding on a panel upgrade?
    Yes, though it is usually more efficient to know the panel plan before starting circuit work.

    Planning a renovation and wondering if a panel upgrade is needed? EZSMART provides licensed load calculations and panel upgrades across Toronto and the GTA. Call 416-838-9006, and see what our customers say on our Google reviews page.

    Recent Comments

    No comments to show.

    Archive

    July 2026
    M T W T F S S
     12345
    6789101112
    13141516171819
    20212223242526
    2728293031  

    Recent Posts

    30 Oct, 2016

    The Best Lighting for Bathrooms with No Windows

    Electricity is arguably the most valuable resource we have in our mode

    Chat with us